Tech Blog

everyWAN Blog

Technology, cybersecurity and IT trends that matter

Deep Analysis
Cybersecurity
IT Trends
Filter by:
Un hombre escribe a mano en su mesa de oficina, con un teléfono de pared colgado a su izquierda
10 min read

The proof of the outage has to come from the mailbox that was down

The Microsoft 365 outage of 12 November (incidents EX1550543 and MO1550821) is paid in SLA credits. But they are not paid automatically: Microsoft requires, in writing, an email from the customer sent from the domain of the affected tenant —the one that was down— and if you bought through a distributor you are not the one who claims. Inside: the user-minute arithmetic for November, the jump from 25% to 50% at 7 h 12 min, the 31 December deadline, the resale chain Microsoft does not accept, and the six-field notebook you fill in while it is still happening.

Sala de servidores pequeña de oficina: dos armarios rack a medio poblar y una bandeja de cableado en el techo
7 min read

Broadcom extends vSphere 8 in Europe only, and support ends with your subscription

On 4 November 2026, inside a blog post about a different product, Broadcom wrote a paragraph that only applies in the European Economic Area: vSphere Standard 8 and Enterprise Plus 8 stay on sale until 31 October 2027, and Extended Support runs "until the earlier of the applicable subscription end date or October 31, 2028". Inside: the three dates that actually count, why 2028 is not your date, the 20 days in which a product is sold after its general support has ended, why the European Economic Area is not Europe, and what really fits into the 357 days left.

Placa base de servidor con dos sockets de procesador, disipadores y bancos de memoria
9 min read

vSphere Express: a fixed 128 cores, one year, one order per customer

The replacement for vSphere Standard now has a SKU code, a distributor price and an availability date. What it does not have, as of 4 November 2026, is a Broadcom announcement — even though Broadcom's own techdocs document it. We work through the arithmetic of a fixed 128-core package against the 16-core-per-socket minimum, with a five-row table, and go through the three lines of small print that decide whether the package exists for you at all: one order per customer, a one-year term and net-new eligibility. And we say when we would NOT buy it, even where that cuts against what we sell.

Depósito de archivo con estanterías móviles y cajas de documentos ordenadas por colores
9 min read

Raising the Microsoft 365 Backup window applies today. Lowering it deletes backups

The Microsoft 365 Backup recovery window has four values: 3 months, 6 months, 1 year or 2 years. Raising it applies immediately; lowering it is "a destructive action" that deletes recovery points, with a 30-day grace period. And there is a second way to lower it that does not look like a deletion at all: moving a mailbox into a policy with a shorter window. We go through that dropdown, the two pages of Microsoft's own documentation that disagree about what happens to what you remove from a policy, and why the archive going up from 1.5 to 3 TB is not a backup.

Sala de servidores con equipos de varias generaciones conviviendo en los mismos bastidores
6 min read

PostgreSQL 14 goes end-of-life on 12 November and nothing will tell your server

On 12 November PostgreSQL 14 gets its final minor release and loses support. Nothing falls over that day, and that is the trap. On a managed database the date turns into money: AWS bills extended support as a separate line item, $0.100 per vCPU-hour in its published example, and reserved instance discounts do not apply to it. On your own server the date turns into nothing at all: no bill, no alert and no security patches. The cloud charges you and, by charging you, tells you.

Sala de servidores con racks de bastidor abierto parcialmente poblados y suelo técnico perforado
6 min read

They will pay for your VMware exit. You sign the term: 36 months

Red Hat waives the first year on a 3-year agreement, Nutanix discounts by deal size with a 36-month minimum, HPE gives up to twelve months of licences and a one-dollar Zerto, and Mirantis pays for the whole migration. Four offers, four brochures and one column almost nobody reads: the term. What each one subsidises, what none of them pays for, what Nutanix's own terms say about renewal pricing, why both published deadlines land before end of support, and the five questions worth asking in writing before you sign.

Servidores retirados apilados sobre un palé de madera junto a sus guías de rack
8 min read

650 servers became 400: where the savings from leaving VMware actually come from

Topgolf says it avoided or eliminated more than $11.3 million in combined infrastructure costs after moving 12,000 virtual machines off VMware. The headline will end up on a slide this week. What will not is in the same report and in the vendor's own documentation: they went from 650 servers to roughly 400, each venue cluster dropped from six nodes with 35 TB to three with 5 TB, and an entire third-party backup product left the invoice along the way. Inside those $11.3 million there are at least four different bills and only one of them is the hypervisor. We separate the sums, say which part does not transfer to your company, and leave you the list of line items that cost about the same with 40 machines as with 12,000.

Frontal de un rack de servidores con varias generaciones de equipos apiladas, iluminadas por sus propios pilotos
8 min read

Multi-hypervisor is not a phase: it is what you will maintain twice

Sixty percent of the VMware customers surveyed by Unisphere Research are considering a multi-hypervisor strategy, and the four barriers they cite most — operational complexity 40%, multi-vendor management 38%, and tied at 37% securing the increased attack surface and team skills — are precisely what running two platforms at once installs in your shop. The list of what you end up maintaining twice, what genuinely does get halved, and when the dual state is the right call.

Armario de red mural de una pequeña empresa con un conmutador y cables sin ordenar
9 min read

Windows Server 2016 ESU is billed from 12 January, whenever you buy it

Windows Server 2016 leaves support on 12 January 2027, 104 days from now. Everyone repeats that; the Azure Arc billing page, less so: licences provisioned after that date are back-billed to 12 January, the charge appears as a separate line item, deactivating and reactivating does not avoid it, deleting and recreating does not either, and Microsoft writes that "there are no conditions under which it can be avoided". Deferring stops being free. And before the price comes eligibility, which is where many smaller companies fall out: on-premises ESU requires Software Assurance or an equivalent Server Subscription, SPLA is not available for 2016, neither is the Visual Studio benefit, and transitioning from Volume Licensing is not supported with Azure Arc. Also: why the bill is decided by how you count cores —16 physical per machine or 8 virtual per VM, with Microsoft's own 1,024-versus-506-core example—, what to ask your CSP now that no list price has been published, and the option that is not on the slide.

Oficina diáfana vacía con mesas de trabajo al fondo y una zona de sofás en primer plano
10 min read

AI speeds up what you write, not what you can deploy

Of the two things DORA said about AI in 2024, in 2025 it observed the opposite for one — delivery throughput flipped sign — and exactly the same for the other, which is the one that costs money: more AI still comes with less delivery stability. Two consecutive reports, same sign. With the METR trial that measured a 19% slowdown where participants perceived a 20% improvement — and the caveats its own authors published afterwards, including a second trial with intervals that cross zero — what the 2026 ROI report assumes in money (one point of change failure rate, $344,000) and the four things that have to take more flow before you buy anything: an environment that looks like production, small batches, a timed rollback and telemetry by symptom.

Nave industrial vacía con el suelo de hormigón, un palé en primer plano y la puerta abierta al fondo
8 min read

Data Act: in January 2027 leaving the cloud becomes free; moving does not

On 12 January 2027 your cloud provider loses the right to charge you for leaving: Article 29(1) of the EU Data Act forbids it. But the big three already dropped that fee back in 2024, so what changes is not the amount — it is that this stops being a conditional credit programme and starts reaching the small providers too. The exit invoice disappears; the cost of leaving stays exactly where it was. The definition of "functional equivalence" speaks of "a minimum level of functionality", binds infrastructure services only, and covers only the features both source and destination offer alike. What you actually get back, what the trade-secret carve-out hides, why multicloud traffic still gets billed, the exact deadlines you can already enforce (two months, thirty days, seven months) and the exit drill that reveals the number no contract contains.

Fila de mesas de oficina con los monitores apagados y una silla vacía
8 min read

Office 2021 does not stop working: it stops being tested against Microsoft 365

On 13 October 2026 nothing switches off: Word will open, Outlook will sync and nobody will notice. That day two clocks start at once and only one makes noise. The first is the ordinary end of support — Microsoft stops providing technical support, bug fixes and security updates. The second raises no alert: Microsoft stops checking that its own services still work with your Office, and the outage arrives months later without you touching a thing. The two different dates Microsoft itself publishes, the Office 2016/2019 precedent from 2023, and the finding that decides who is in a hurry: Windows 11 24H2 Home and Pro expires in the very same second, but the Enterprise edition holds on for another year.

Cajas de archivo numeradas en estanterías de un depósito documental
9 min read

One checkbox will protect a whole workload in Microsoft 365 Backup. What it bills is not what you see in the usage report

Full Workload Backup reaches general availability from mid-September: one policy per workload protecting every SharePoint site, or every OneDrive account, or every mailbox, including the ones created later. List price is $0.15 per GB per month, applied to a base that adds in the second-stage recycle bin and online archives. Microsoft warns that its own usage report includes neither, "and is thus incomplete", and offers a calculator that does ask for them. The problem is that the report is what everybody looks at.

Mesa de una oficina administrativa a última hora: archivadores de anillas, una calculadora de sobremesa y un archivador metálico con un cajón abierto
5 min read

5% more for paying monthly: what changes on 1 October, and when not to switch

From 1 October 2026 Microsoft will add a 5% uplift to CSP software subscriptions on annual terms billed monthly: it names Windows Server, SQL Server, CALs and System Center, and leaves the list open. The product does not change; the price of money does. The full arithmetic — that 5% works out at borrowing at roughly 11% a year — why your date is not 1 October but each line's renewal date, and the cases where moving is not worth it.

Subscribe to our newsletter

To receive IT stories, everyWAN news and exclusive subscriber offers, sign up to our mailing list

Minorisa de Sistemas Informaticos y Gestión S.L. © 2026
everyWAN
everyWAN