Spain's state gazette has just signed your company the lowest service level agreement it will ever have. It is in Real Decreto 1026/2026, published on 19 November and in force from 1 January 2027: from that date small and medium companies sit inside the universal telecoms service under their own name, and the guaranteed minimum rises from 10 to 100 Mbps. Both of those are good. And both read differently once you treat the text as what it operationally is: an SLA, with its figures and its small print.
We are writing this from the other side of the counter: everyWAN is a network operator in its own right —transit, peering, BGP and a public looking glass— as well as the company that builds its clients' networks. So we have an obvious conflict of interest and we declare it up front: we sell exactly what this post concludes you need. That is why there is a whole section below on when you should not buy it from us.
What it says, and who it names
The headline change is speed. Article 11.2 sets it flatly: "La velocidad mínima de acceso a internet de banda ancha queda fijada en 100 megabits por segundo (Mbps) en sentido descendente, y en 5 Mbps en sentido ascendente" —100 Mbps down, 5 Mbps up. The previous framework, the 2022 General Telecommunications Act, stopped at 10 Mbps down. The floor goes up tenfold.
The bigger change, for us, is a list. Article 9 says who these rights belong to: "consumidores y a los usuarios finales que sean microempresas y pequeñas y medianas empresas y organizaciones sin ánimo de lucro" —consumers, micro-enterprises, SMEs and non-profits. Until now the universal service was argued in the language of households. From January, a fifteen-person company on a badly served industrial estate can request rather than plead. Article 13.2 puts a clock on it —«un plazo máximo de treinta días naturales, contados a partir de la recepción de la solicitud», thirty calendar days from the request— and 13.4 puts a consequence on it: if the operator overshoots, it must compensate by waiving one monthly connection fee for every month or part-month of delay. Keep both of those in mind, because the small print of 13.2 comes back at the end of this post.
The first number that does not mean what it looks like: the average
Article 11.2 does not end there. One paragraph further down, the same clause spells out how that figure is met: «[...] el operador u operadores obligados garantizará la citada velocidad global de datos que debe proporcionar la conexión, promediada a lo largo de cualquier periodo de 24 horas, para el 95 por ciento de los casos, teniendo en cuenta las funciones específicas de la tecnología de acceso correspondiente» — the speed is guaranteed averaged over any 24-hour period, for 95 per cent of cases, allowing for the specific functions of the access technology.
A 24-hour average blends, by construction, eleven on a Tuesday morning with four on Wednesday morning, when nobody is in your office. And it allows a 5 per cent tail of cases outside on top of that. It is worth not stretching the text further than it goes: it does not say they may deliver less for seventy-two minutes a day. It says something simpler and more uncomfortable, which is that a commitment averaged across a day leaves out the hour your people work. A corporate SLA is written the opposite way: percentile, short measurement window, penalty. A legal floor is written this way because it is a floor, and floors are met from below.
The number that hurts most is the 5
A hundred down and five up is a twenty-to-one ratio: the shape of a line designed to consume, not to work. And what a company does with its line almost always goes upstream: the backup leaving for the cloud, the file being shared, the camera on the video call, the remote desktop pushing screen back, the hosted ERP writing.
The arithmetic, which is ours and we label it as such: 5 Mbps is 625 kB per second at the theoretical ceiling, that is 2.25 GB per hour and 54 GB if you spend the entire day uploading and nobody else touches the line. An initial 500 GB copy takes, at that ceiling you never actually reach, more than nine days. That is the number that really sets your backup window, and it is the one the regulation places twenty times below the other. If your continuity plan assumes a restore or a first seed travels over the line, there is the arithmetic that decides it.
690 ms, and why it is not an oversight
Article 11.5 adds the parameter that got the fewest headlines: «La latencia media total máxima de la conexión será de 690 ms, incluyendo sentido ascendente y sentido descendente» —a maximum mean latency of 690 ms, counting both directions. Round trip, in other words. Split, that is roughly 345 ms one way.
To avoid overstating it, set that against the usual reference, ITU-T G.114, which defines three bands of one-way delay: 0 to 150 ms is essentially transparent for conversation; 150 to 400 ms remains acceptable provided the people planning the network are aware of the impact; above 400 ms is deemed unacceptable for general planning. Those 345 ms land in the middle band, the "acceptable if you know what you are buying" one, not in the unacceptable one.
With one caveat that works against the figure, not for it: G.114 measures end-to-end mouth-to-ear delay, codec and jitter buffer included, not bare network transport. If those 345 ms are only the journey, adding the rest of the chain exhausts the budget and crosses 400. Which means the generous reading in the previous paragraph is the most generous available, and even then it barely holds.
That 690 is set where a geostationary satellite fits is not our observation first: the specialist coverage of the decree made that point on the day it was published. Our contribution is only the arithmetic check, and it adds up: geostationary orbit sits at 35,786 km, the signal goes up and comes down in each direction, so a round trip covers 143,144 km, and at the speed of light that is about 478 ms from distance alone, before a microsecond of electronics. Which leaves a couple of hundred milliseconds for everything else. And we say it without reproach: in a valley with no fibre and no decent copper, satellite is the difference between having and not having, and a rule that excluded it would protect nobody.
What does strike us as odd sits one line above, on the same page. Article 11.4 lists the services that connection has to support, and its point k) reads: «llamadas telefónicas y videollamadas (calidad estándar)» —telephone calls and video calls, standard quality. Article 11.4 requires the video call; article 11.5 sets the maximum latency that makes that video call an uphill job. They are on the same page, in consecutive clauses. Nobody's mistake —the regulation has to be technology-neutral and cover the same ground by satellite as by fibre— but it is the proof that those 690 ms are a coverage threshold, not a service promise.
The two parameters that actually ruin a call are, for now, still unset. Article 11.6 leaves them for later: «Mediante orden dictada por el titular del Ministerio para la Transformación Digital y de la Función Pública se podrá modificar el parámetro de la latencia, así como determinar otros parámetros técnicos, como los relativos a fluctuación de fase y pérdida de paquetes de datos [...]» — the Ministry may later modify the latency parameter and set other technical parameters, such as those relating to jitter and packet loss. May. Today, an access line with a 100 Mbps daily average and 690 ms complies even if it drops packets in bursts, and bursty loss is what makes a video call stutter while the speed test comes out perfect. That is why we do not measure latency once: we graph it continuously alongside loss, because what informs you is the tail of the distribution, not the mean.
What the floor does not cover: the day it goes down
The new decree does not touch what you get back when the service is interrupted. That still lives in the 2009 users' charter, Real Decreto 899/2009, of which 1026/2026 repeals only articles 3.a), 4, 28 and 29. The ones that matter here, 15 and 16, remain in force and untouched.
The heading of each article already says a lot. Article 15 is the «Derecho a indemnización por la interrupción temporal del servicio telefónico disponible al público»; article 16 is the «Derecho a compensación por la interrupción temporal del servicio de acceso a Internet». Voice gets indemnified; internet gets compensated. The difference in vocabulary then holds up in the figures.
Run the numbers on an ordinary case, with the assumptions stated: a €40-a-month line, a 30-day month, six hours down. 40 ÷ 720 h × 6 h = €0.33. Thirty-three cents for a whole morning of a stopped office. And if the outage lasted five and a half hours, there is no automatic obligation at all: it falls under the general rule of article 16 and you have to claim it yourself.
Two caveats on that calculation, because the method matters as much as the figure. One: paragraph 3 of that same article 16 says that, in a bundle, the price attributable to internet is whatever the operator declares and, «Si el operador no comercializara los servicios por separado, se considerará que el precio correspondiente al servicio de acceso a Internet es del 50 por ciento del precio total» — if the operator does not sell the services separately, internet is deemed to be 50 per cent of the total, which can take those thirty-three cents down to seventeen. Two, and it runs the other way: if that same line carries fixed telephony, the cut also interrupts voice, and then article 15 applies with its five-times multiplier and its automatic trigger above one euro. The real amount depends on how your bill is itemised, which is exactly the place nobody looks until the day they have to file a claim.
It is an observation about limits, not a reproach: no regulation can price your margin, so it prices the only thing it can, your subscription fee. The 2009 detail that does age badly is a different one, and it shows up better from here: the five-times multiplier goes to voice, the service your revenue barely depends on any more, while the piece it depends on entirely goes without.
On the very 19 November the decree came out, a fibre operator had an incident with clusters of reports in eight cities —Madrid, Málaga, Granada, Valencia, Barcelona, Seville, Bilbao and A Coruña— almost all of it on fixed lines, with mobile working. It started around eight in the morning, the coverage says the problems disappeared "hours later" without saying when, and the operator published no cause. And there is the detail that actually matters: nobody knows whether it crossed six hours. Not the customer, not the reporter who covered it, and probably not whoever has to decide the compensation. The threshold that determines whether you get paid automatically or have to file a claim falls inside the margin of error of that day's own reporting.
What actually decides the outcome
We have been repeating the same sentence for years because it is still true: failure is inevitable, an outage is a design decision. A three-hour access cut is a failure. Your company not invoicing for those three hours is an outage, and what separates the two comes down to two questions: whether the site has a second path, and whether failover happens without anyone doing it by hand. That is what a properly built SD-WAN is for.
The six questions we ask when somebody shows us their "redundant line":
- Two accesses or two invoices? Two operators buying from the same wholesaler and entering through the same duct are one path with two bills. Ask about the access infrastructure, not the brand: we covered this in full in two carriers on the invoice, one core on the network.
- Who fails over? If the answer is "we call and somebody changes something", your recovery time is a person's response time. Time it, do not estimate it.
- Do sessions survive? If switching links changes the egress IP, the VPN, the SIP registration and the remote desktop all drop. Technically you failed over; to the user, it went down anyway.
- What do you measure, and with what history? A latency average detects nothing, and neither does an availability percentage: 99.9 per cent does not tell you how long the outage lasts. Loss and jitter in short windows, graphed, with months behind them so you can say "this started on Tuesday".
- What runs over the surviving path? A backup link with no priorities saturates in five minutes with backups and updates, and it looks like it is still down. Decide in advance what goes and what waits.
- When was the last drill? Unplug the primary link on purpose, on a Tuesday morning, with everyone watching. An untested backup is not a backup: it is a lucky charm. We have seen it with backup links that were still 3G while 3G was being switched off.
And a seventh that is paperwork rather than networking, and that people discover late: when the access goes down, somebody has to be able to document the outage from outside the system that was down. If your only evidence of six hours without a line lives in a mailbox that was not working either, you will not even be able to file the article 16 claim for those thirty-three cents.
When you should NOT buy this from us
Three cases, said against our own commercial interest. One: if your site can take four hours without connectivity and lose no money —and some businesses genuinely can, there is no shame in it— do not build a managed second line. Put in a backup SIM, write down who gets called, and spend the money elsewhere. Two: if your problem is that the line crawls at eleven in the morning, a second path will not fix it; that is capacity or traffic priority, and it is diagnosed by measuring before buying anything. Three: with a single site and no critical in-house applications, a full SD-WAN can be over-engineering; two accesses and a device that fails over properly, with sessions handled, solve most of the problem for a fraction of the cost. We develop that third case separately in when an SD-WAN pays off and when it is overkill.
And a fourth case, the opposite one, with its small print attached: if there is no real alternative in your area, the universal service is the tool to use. But the thirty-day deadline in article 13.2 opens with two conditions almost nobody quotes —«Si de acuerdo con el artículo 20 no hubiera ningún operador designado, los operadores ofrecerán y, en su caso, habilitarán en aquellas unidades inmobiliarias en las que, según su oferta comercial, ya prestan el servicio...», that is, only where no operator has been designated and only in buildings where an operator already provides the service— and 13.4 finishes the job by requiring that no force majeure or applicant-attributable causes intervene. Translated: the comfortable deadline only exists if somebody already serves your building. If nobody reaches your industrial estate, your route is not the thirty-day deadline, it is the operator designation procedure. Slower and less convenient, but it is the one that exists, and worth knowing before you ask.
A floor is not a plan
The state gazette has just multiplied the minimum by ten and brought SMEs inside, and that is a good thing. What it has not done —and cannot— is decide for you whether a three-hour outage costs you nothing or costs you a morning of revenue. You made that decision, or deferred it, the day you signed for one path into your office instead of two. Everything else, when the cut comes, will be thirty-three cents on next month's bill.
Sources (verified 23 Nov 2026): honest attribution first: reading the 690 ms as the threshold where geostationary satellite fits is NOT ours —the specialist coverage of the decree published it the same day— and ours is only the arithmetic check and the contrast with article 11.4. Real Decreto 1026/2026, of 18 November (state gazette no. 288, 19 November 2026), the source of the literal quotes from articles 9 (beneficiaries), 11.2 (100/5 Mbps and the 24-hour average for 95 per cent of cases), 11.5 (690 ms counting both directions), 11.6 (the ministerial order that "may" set jitter and packet loss), 11.4 k) («llamadas telefónicas y videollamadas (calidad estándar)»), 13.2 (its two preconditions and the thirty calendar days) and 13.4 (the fee waiver), plus the 1 January 2027 entry into force and the repeal of articles 3.a), 4, 28 and 29 of RD 899/2009. The article 15 and 16 quotes —the "indemnity" and "compensation" headings, "the greater of the following two", "five times the monthly subscription fee", the 1-euro threshold, the refund of subscription and fixed fees prorated by the length of the interruption, , "more than six hours between 08:00 and 22:00" and the 50 per cent rule of paragraph 16.3— come from the consolidated text of Real Decreto 899/2009. The three one-way delay bands (0-150 ms, 150-400 ms, above 400 ms) are from ITU-T G.114, "One-way transmission time". The previous 10 Mbps minimum is from article 37.1.a) of Law 11/2022, the General Telecommunications Act. The three G.114 bands are measured end-to-end, mouth-to-ear. The 19 November incident comes from Spanish press coverage that day based on Downdetector; no official cause was published and we attribute it to nobody. Our own arithmetic, nobody's published figure: the 625 kB/s, 2.25 GB/hour, 54 GB/day and "more than nine days" for 500 GB at 5 Mbps (theoretical ceiling, decimal GB, no headers or competing traffic deducted); the 143,144 km round trip to geostationary orbit and the ~478 ms that imposes at the speed of light; and the €0.33 for a €40/month line with a 30-day month and a six-hour cut. Splitting the total latency into "roughly 345 ms one way" is our own reading of a text that speaks of total mean latency including both directions.